Hi,
if one company decides to install permanent steam blowing line (blowoff line) to the atmosphere for Supercritical coal fired boiler. The installation is done by modifying the superheater header at each side. what are the related clauses for this steam blow line in asme section 1.
thanks.
if one company decides to install permanent steam blowing line (blowoff line) to the atmosphere for Supercritical coal fired boiler. The installation is done by modifying the superheater header at each side. what are the related clauses for this steam blow line in asme section 1.
thanks.