I'm dealing with a 1500kVA 12kV:277/480v step-down transformer with a bolted pressure switch (BPS) installed nearby. This is on a generator distribution system which is energized for about 10 hours daily & shut down the rest of the time.
There is a phase loss/imbalance relay in the BPS which trips about half the time on energization, even when set to max time delay of 6 seconds. The relay holds in when the switch is closed after energization. The relay was replaced once, so it's unlikely that the relay was the problem.
Any thoughts? This is a purely academic question now as the relay has been disconnected.
There is a phase loss/imbalance relay in the BPS which trips about half the time on energization, even when set to max time delay of 6 seconds. The relay holds in when the switch is closed after energization. The relay was replaced once, so it's unlikely that the relay was the problem.
Any thoughts? This is a purely academic question now as the relay has been disconnected.