MaxNeg63
Petroleum
- Jul 6, 2005
- 23
One of our suppliers states in his P&P procedure that duplex steel pipes can be treated for a time "up to 24 hours". Solution used is 10%-16% nitric acid + 5%-8% hydrofluoric acid in water at ambient temperature (10-25 °C)
Isn't it a very long dwell time? Is there any risk of damaging the pipe surface? And besides, are there any methods to speed up the process?
Thanks
Max
Isn't it a very long dwell time? Is there any risk of damaging the pipe surface? And besides, are there any methods to speed up the process?