PID & DO control

Status
Not open for further replies.

panelman

Electrical
Jun 29, 2002
199
Anyone have any experience using PID controls to control DO via airation?
 
Replies continue below

Recommended for you

panelman, Yes, I have experience with PID Control loops. Three questions: What do you mean by "DO"? What do you mean by "airation" and What do you want the control loop to do?

saxon
 
DO = dissolved oxygen, Aeration = blowing air through the sewage and the loop controls the aeration to maintain the DO at set point

But it is a spectacularly unstable process, non of my normal PID tuning methods seem to be working well enough to let me get a P band of less than 50% which is better than the previous controller was managing but I feel I should be able to improve it.

I was hoping for someone who has done it already, it’s quite a common process in water treatment
 
Panelman

PID controls very common but you often use two or more to control the process. For example use a loop to control actual DO against DO setpoint in each aeration zone. You want to use a different loop to then control the blowers against an aeration set point. I have also been involved with systems where separate flow set points are used which can provide a more stable DO band. Basically the design depends on the diurnal variation oxygen demand and the rate of change which is a function of the sewage works catchment.

Jonelv
 
Cheers for that...in the system we have the blowers pid loop is used to maintain a constant pressure in the air main. This then feeds actuated valves controlled to match a DO set point in each zone
 