auzie5
Mechanical
- May 8, 2009
- 94
Should we include corrosion allowance on pig closures (3.2mm on the sour service line) if the line is being purged with Fuel Gas (sweet)?
Also, does anyone know if A350 LF2 is an acceptable alternative to CSA Gr.359 CAT II in this application?
Thanks,
Also, does anyone know if A350 LF2 is an acceptable alternative to CSA Gr.359 CAT II in this application?
Thanks,