struct_eeyore
Structural
- Feb 21, 2017
- 257
Hi all,
Recently got a geotech report back that gives me an allowable lateral pile capacity of 1 ton. What is surprising to me, is that we have limestone bedrock 2-3' below ground surface, and we will be augering piles at least 10' into this bedrock. The SPT yields 50 blows per 4". I've limited geotech experience, I anticipated a much higher number.
Recently got a geotech report back that gives me an allowable lateral pile capacity of 1 ton. What is surprising to me, is that we have limestone bedrock 2-3' below ground surface, and we will be augering piles at least 10' into this bedrock. The SPT yields 50 blows per 4". I've limited geotech experience, I anticipated a much higher number.