Hi,
Can someone brief me the criteria of pile set and pile load test for friction pile and end bearing.Please correct me if im wrong as well.
Friction pile - no set taken during driving, wait for at least 2 weeks for dissipation of negative pore water pressure n mobilisation of the friction then conduct the static load test.
ENd bearing - set taken during driving, static load test could be conducted the next day.
Any additional information that i should know or please correct me when im wrong. i'm here to learn.
Can someone brief me the criteria of pile set and pile load test for friction pile and end bearing.Please correct me if im wrong as well.
Friction pile - no set taken during driving, wait for at least 2 weeks for dissipation of negative pore water pressure n mobilisation of the friction then conduct the static load test.
ENd bearing - set taken during driving, static load test could be conducted the next day.
Any additional information that i should know or please correct me when im wrong. i'm here to learn.