Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Piled Foundation on Embankment

Status
Not open for further replies.

Catjacob

Civil/Environmental
Nov 23, 2006
37
0
0
GB
Is it possoble to do secant bored piled walls on the side slopes of embankment AND a diaphragm wall in the centre of the embankment??

The embankment is 10m wide and 6m high??
 
Replies continue below

Recommended for you

The slope is at about 40 degrees to horiz line.

The central walls are designed to support a bridge deck. After the bridge deck or the wall has been in place, a section of the embankment is removed and a new road will be contructed
 