Dear All,
We have a blow down header of CS 20" size wherein we need to have a 20 x 12 connection.
As per PMS branch table it calls for Pipe to Pipe connection with RF pad.
As per another clause in the Piping design philosophy it has been advised to have a lateral tee on the blow down header in case where the branch size is greater than half the size of the header.
In our case header size is 20" & the branch size is 12" hence we need Latrolet for this connection.
Can I go ahead with Pipe to Pipe connection for this lateral connection?
My understanding is, when PMS branch table says Pipe to Pipe, I have to make it Pipe to Pipe connection even though it is Lateral connection.
Pls revert with your advice.
Thanks & Regards,
Abhijit
We have a blow down header of CS 20" size wherein we need to have a 20 x 12 connection.
As per PMS branch table it calls for Pipe to Pipe connection with RF pad.
As per another clause in the Piping design philosophy it has been advised to have a lateral tee on the blow down header in case where the branch size is greater than half the size of the header.
In our case header size is 20" & the branch size is 12" hence we need Latrolet for this connection.
Can I go ahead with Pipe to Pipe connection for this lateral connection?
My understanding is, when PMS branch table says Pipe to Pipe, I have to make it Pipe to Pipe connection even though it is Lateral connection.
Pls revert with your advice.
Thanks & Regards,
Abhijit