jamesbanda
Chemical
- Sep 21, 2004
- 223
Dear sirs,
We are designing a 2 inch / 3inch line on a new project which will require regular pigging (once very 1 year) due to a slow buildup of material. This is detected by increased pressure on the line.
Line length is approx 600 meters and carbon steel.
I am looking for advise on what critiera should be spec'd on the line to ensure it can be pigged easily?
Is there a max bend size ?
higher mawp of linework..?
maximum lenght for pigging ? (breaks every xx meters)?
specalist pig catchers to be installed?
We are designing a 2 inch / 3inch line on a new project which will require regular pigging (once very 1 year) due to a slow buildup of material. This is detected by increased pressure on the line.
Line length is approx 600 meters and carbon steel.
I am looking for advise on what critiera should be spec'd on the line to ensure it can be pigged easily?
Is there a max bend size ?
higher mawp of linework..?
maximum lenght for pigging ? (breaks every xx meters)?
specalist pig catchers to be installed?