bosse1950
Industrial
- May 19, 2005
- 20
I am working on a project where double block & bleed isolation is required to change out a 30" leaking & passing ESD Valve. We are investigating 30" x 30" mechanical hot tap fitting (s) hot tapping, & insertion of line stop(s). We are looking to achieve isolation by means of either two traditional stopples or one BISEP double block & bleed isolation tool.Also there are 2 possible locations - one is in the splash zone directly below the +15ft clamp and the other is sub sea ar -200ft in the horizontal. Are there any of you who could provide me with feedback on these types of installations based on past experiences? Your input will be greatly appreciated.