With a lateral load acting perpendicular to the roof ridge your horizontal diaphragm shear is maximum. Conveniently at the same time the diaphragm is discontinuous. What are people normally specifying to get the load trough this joint?
Assuming your roof is not taking a ridiculous amount of lateral load then shouldn't blocking between the roof trusses be enough as long as the nail spacing and penetration requirements are meant.