Have been given the task of developing new numbering system for old boiler. Some tags and some tag information exist.
The last person started system and 2mo. In was fired.
Admin want it done, slap tags and go.
Plant wants logical system to produce logical PM work order. but admin produces w.o.
I have big ears to listen to ideas be for they replace me too.
 
Replies continue below

Recommended for you

If that's all the information you have or are willing to present, then you'd better be polishing up your resume.

TTFN
faq731-376
7ofakss
 
Use ISA-5.1-1984 (R1992) as your standard and especially so if that's what the balance of the plant uses.

Pamela K. Quillin, P.E.
Quillin Engineering, LLC
 