Assuming you have already modeled the pond in HydroCAD, you can see the draw-down by examining the elevation column in the tabular hydrograph.
If you need help setting up the pond, just enter your data including the desired starting elevation. Set the time span to start at zero hours and watch the pond drain. You do NOT need an inflow hydrograph - all your water will come from the starting elevation.