StraitEng
Civil/Environmental
- Mar 12, 2007
- 1
I have just recently started using the software to design a detention pond for limiting post development flows to predevelopment flows. The program has sized the pond.
I have a problem with determine the outlet configuration of pipes and risers, etc. to get the peak outflow to match the target peak outflow. My peak outflow from the pond is always lower that the target peak in the pondmaker worksheet.
I have a problem with determine the outlet configuration of pipes and risers, etc. to get the peak outflow to match the target peak outflow. My peak outflow from the pond is always lower that the target peak in the pondmaker worksheet.