EliotGreenwood
Structural
- Mar 3, 2018
- 2
I am designing a sport netting structure (post and pier).
just wondering what formula or rule of thumbs are out there for required embedment of the post into the pier in order to ensure the post acts as a fixed connection into the pier?
pier is 450mm dia and 3.5m deep
post is 219X6.8 CHS
post is cable tension point loaded with 3 anchor points at the top each with 3.5KN each cable. loads are along x and z axis with another inbetween at 45degrees.
just wondering what formula or rule of thumbs are out there for required embedment of the post into the pier in order to ensure the post acts as a fixed connection into the pier?
pier is 450mm dia and 3.5m deep
post is 219X6.8 CHS
post is cable tension point loaded with 3 anchor points at the top each with 3.5KN each cable. loads are along x and z axis with another inbetween at 45degrees.