Let's say for example you have a retaining wall repair. The top of the wall is going to be saw cut, removed and replaced. The wall is only 6" thick (it's short) and you will drill and epoxy bars into the existing wall. Would you find the development length required and call it good or are you checking appendix D (aka embedded anchor)? Say you have a very shallow required development length (lap length) of less than 12". Is there reason to check Appendix D?