Dear All,
Referring to the above mentioned subject, the situation here is that the Client/Architect already specified to build fence with column and beam however, the Contractor have constructed perimeter wall (retaining wall) without providing starter bar for the column fence. The column fence will be built on top of the retaining wall. Thus, I am planning to drill the retaining wall and provide starter bar. My query is how do I calculate the embedment depth, overlap length/anchorage length and what size of starter bar shall I use. My design will be in accordance to British Standard.
I have looked through Lokfix Fosroc Data Sheet for the embedment depth of the starter bar/new rebar to the existing RC members and I saw that for starter bar of size 12mm diameter, the embedment depth would be 225mm min. How do I check if this embedment depth will be enough for my post?
Thank you for your help.
#LoveWins
Referring to the above mentioned subject, the situation here is that the Client/Architect already specified to build fence with column and beam however, the Contractor have constructed perimeter wall (retaining wall) without providing starter bar for the column fence. The column fence will be built on top of the retaining wall. Thus, I am planning to drill the retaining wall and provide starter bar. My query is how do I calculate the embedment depth, overlap length/anchorage length and what size of starter bar shall I use. My design will be in accordance to British Standard.
I have looked through Lokfix Fosroc Data Sheet for the embedment depth of the starter bar/new rebar to the existing RC members and I saw that for starter bar of size 12mm diameter, the embedment depth would be 225mm min. How do I check if this embedment depth will be enough for my post?
Thank you for your help.