POPPASMURFF1942
Petroleum
- Nov 2, 2006
- 11
Gentlemen and Ladies,
This question has probably been answered in this forum before.
I am drafting exhibits for the QA manual in a new ASME CODE SHOP fabricating Section VIII vessels.
The Document lining out the procedure you want the PWHT company to follow. Temp, Ramp up sequence Hold Cool down Rates. I just need a little guidance.
I thank you in advance for any information or documents.
This question has probably been answered in this forum before.
I am drafting exhibits for the QA manual in a new ASME CODE SHOP fabricating Section VIII vessels.
The Document lining out the procedure you want the PWHT company to follow. Temp, Ramp up sequence Hold Cool down Rates. I just need a little guidance.
I thank you in advance for any information or documents.