adsmitty
Structural
- Nov 11, 2009
- 1
I have an existing conveyor gallery structure at an 18 degree slope. I need to replace the floor with a corrugated, 1 1/2" composite deck with light weight concrete (f'c = 5000psi). The corrugations of the deck are perpendicular to the axis of the conveyor.
Does anyone know if a contractor could pour this type of concrete floor at such a steep angle? Any references would be appreciated.
Thanks,
Adam-
Does anyone know if a contractor could pour this type of concrete floor at such a steep angle? Any references would be appreciated.
Thanks,
Adam-