I am designing an earthing system for 240MW power plant, the area is 230x720m, average soil resistivity 14,000ohm-m(Sedimentary rock), fault current 20kA. I used 120sqmm cooper condr with 15x15m spacing, 0.5m depth. With this data I am getting ground grid resistance 9 ohm, GPR more than 7000V and abnormal step & touch potentials.
1. can anyone suggest how to achieve ground resistance up to 5ohm(Tech. spec. requirement)?
2. is it proper to use treated earthing pit(consting, charcoal, bentanovate material, salt etc,) at various locations connected to main grid?
3. is it possible to model treated earthing pit in ETAP?
There is constraint, we can't increase no. of conductor, I mean minimum grid conductor spacing 15m.
thanks!
ELEP
I am designing an earthing system for 240MW power plant, the area is 230x720m, average soil resistivity 14,000ohm-m(Sedimentary rock), fault current 20kA. I used 120sqmm cooper condr with 15x15m spacing, 0.5m depth. With this data I am getting ground grid resistance 9 ohm, GPR more than 7000V and abnormal step & touch potentials.
1. can anyone suggest how to achieve ground resistance up to 5ohm(Tech. spec. requirement)?
2. is it proper to use treated earthing pit(consting, charcoal, bentanovate material, salt etc,) at various locations connected to main grid?
3. is it possible to model treated earthing pit in ETAP?
There is constraint, we can't increase no. of conductor, I mean minimum grid conductor spacing 15m.
thanks!
ELEP