Need some guidance in a study I am trying to attempt as a EE in training.
Background: I work in the O&G industry and we have our own generation, transmission, and distribution. I have a distribution circuit that has high 13.8kV and low 120V. It consists of two substations both of which are 13.8kV. The first substation supplies a 4500HP compressor motor, feeds second substation, and two 120V loads. The second substation just feeds two 120v and two 480v. The circuit are setup for redundancy with normally open circuit breakers, I am not sure what this setup is called.
I am attempting to use ETAP to study this circuit under conditions which may result in equipment being overloaded. We want to know the conditions under which it will be operating above equipments nameplate rating. I am completely new to this and not sure what is the best method to approach this.
I am sure I am not even aware of what is needed to complete such a study. Let alone calling it a study. This is the only place I know to begin.
Background: I work in the O&G industry and we have our own generation, transmission, and distribution. I have a distribution circuit that has high 13.8kV and low 120V. It consists of two substations both of which are 13.8kV. The first substation supplies a 4500HP compressor motor, feeds second substation, and two 120V loads. The second substation just feeds two 120v and two 480v. The circuit are setup for redundancy with normally open circuit breakers, I am not sure what this setup is called.
I am attempting to use ETAP to study this circuit under conditions which may result in equipment being overloaded. We want to know the conditions under which it will be operating above equipments nameplate rating. I am completely new to this and not sure what is the best method to approach this.
I am sure I am not even aware of what is needed to complete such a study. Let alone calling it a study. This is the only place I know to begin.