Hi

If we are talking about the US market, how much do the PEB fabricators approximately sell the MTON to the customer? including ( fabrication and finishing).





ôIf you don't build your dream someone will hire you to help build theirs.ö

Tony A. Gaskins Jr.
 
Replies continue below

Recommended for you

Their costs are very similar to any other fabricated steel. Their economy is:
[ol 1]
[li]Having a one stop shop (engineering, architecture and detailing).[/li]
[li]Optimizing the design. Much of their design effort is to use light sections such as plate fabricated tapered columns and beams; cold formed Z purlins, etc. [/li]
[/ol]
 