ARE PRE-ENGINEERED COLUMNS BOLTED DIRECTLY TO THE SLAB OR IS THE BASEPLATE ACTUALLY 2" ABOVE THE SLAB WITH NONSHRINK GROUT INSTALLED (SO THAT A COLUMN LEVELING NUT CAN BE ADDED, SIMILAR TO CONVENTIONAL STEEL)
ANY GOOD REFERENCE MATERIAL SHOWING TYPICAL DETAILS OF THE FOUNDATION CONNECTIONS.