chanel86
Electrical
- Aug 27, 2007
- 14
Dear all,
We need a prefabricated treatment plant for treatment of wastewater of school were some student live there. Approximately 300 pers. and water treated will be used for irrigation .
The total flow @ peak hour is 65 m³/day. Plant should be closed or underground.
So if you know a supplier or a design for such plant.
Thank you in advance for your help.
ModonGroup S.a.r.l
We need a prefabricated treatment plant for treatment of wastewater of school were some student live there. Approximately 300 pers. and water treated will be used for irrigation .
The total flow @ peak hour is 65 m³/day. Plant should be closed or underground.
So if you know a supplier or a design for such plant.
Thank you in advance for your help.
ModonGroup S.a.r.l