i have a contractor that is putting up a masonry block building. He showed up this morning with tubs of mortar already made to lay the block with. He said this is the method they typically use....and the mortar is enough to last him a couple of days. I have never seen this before...typically the Masson has a mixer and a sand pile on-site to do his mixing. Anyone have thoughts?