I am curious to know how others have detailed pre-cast piles to the "poured in place" cap?
I am looking for an equivalent shear connection to (4) #9 hook bars which are epoxy grouted into pre formed holes. Possibly a more economical approach. The piles are 20"x20".
Thanks so much,
Mark