swazimatt
Civil/Environmental
- Aug 19, 2009
- 248
An existing chip and spray road is going to be widened and given a 30mm continuously graded asphalt overlay.
I will specify a prime coat for the widened portions, where a new base (crushed stone base) and sub base layers (stabilised gravel) will be constructed, do i then need to specify a tack coat for where the asphalt will overlay the existing chip and spray surface?
I will specify a prime coat for the widened portions, where a new base (crushed stone base) and sub base layers (stabilised gravel) will be constructed, do i then need to specify a tack coat for where the asphalt will overlay the existing chip and spray surface?