Hello to everybody.
I am a mech Engineer. I work in Italy in a mech factory.
I use Pro-E since 2001 but I am new in Pro/program.
I have to solve this issue. I have an assembly with two parts (part A and part B).
I have to rotate these these two parts on their axis. After that I have to make a boolean operation A-B. No problem to do this one time.
After this, I have to rotate another time of a little quantity theta and repeat the boolean operation. And so on for 2000 times.
So the problem is that I don't know how create an automatic process to repeat this operation 2,000 times (each time rotating of this little quantity).
Could anyone give me a Help?
thanks in advance

Alessandro
 