Hey Users:

I'm trying to import a revision scheme in to interlink as follows:
1 - 01-P1
2 - 01-P2
3 - 01-P3
4 - 01
5 - 02-P1
6 - 02-P2.....

my problem is after I import this scheme it reorder the sequence as follows:
1 - 01
2 - 01-P1
3 - 01-P2
4 - 01-P3
5 - 02
6 - 02-P1.....

Does anyone know how I can maintain the sequence of my choice with out the system defaulting to reordering the scheme.

thanks for you time.
-Caper-
 
Replies continue below

Recommended for you

The scheme, while defined in a file, still has to follow rukes that allow Pro/E to open a higner revision first. Maybe if you enetered all of your revsiosn to be the same length and made the last one something like 01-Z0, then it would fall to the end of the sequence. You can trim the field when displayed on the drawing.

"Wildfires are dangerous, hard to control, and economically catastrophic."
"Fixed in the next release" should replace "Product First" as the PTC slogan.

Ben Loosli
CAD/CAM System Analyst
Ingersoll-Rand
 
Status
Not open for further replies.
Back
Top