german9011
Mechanical
- Dec 29, 2014
- 7
I'm new to working with asys.
the problem is that I need the simulation late 0011 s, implying that the processing time is 330 hours is too long.
I tried to change several option in ansys workbench but the program continues to create partitions 1e-9 which are too small to generate the simulation too late.
as I can do to make simucion done in time you desire without taking so long.
I am very grateful to the person who can assist me with this situation.
the problem is that I need the simulation late 0011 s, implying that the processing time is 330 hours is too long.
I tried to change several option in ansys workbench but the program continues to create partitions 1e-9 which are too small to generate the simulation too late.
as I can do to make simucion done in time you desire without taking so long.
I am very grateful to the person who can assist me with this situation.