Eclair
Electrical
- Oct 14, 2007
- 12
Hi
I have simulated my electrical system on ETAP on it gives me a short circuit current too high if a 3 phase short circuit happens. It makes the distribution panel breaker useless: the upstream breaker trip and I lose all my loads (servers...).
What are my solutions then?
I thought to introduce a fused panelboard instead of breaker. It would probably solve my problem. Expensive though cause the panel have to be hand-made.
I also thought to limit the short circuit current but how and what? By introducing an additional a serial impedance between my MCC (600V) and my panelboard, it would probably reduce the short circuit current. Extra cable? An inductance?
What do you think about that?
I have simulated my electrical system on ETAP on it gives me a short circuit current too high if a 3 phase short circuit happens. It makes the distribution panel breaker useless: the upstream breaker trip and I lose all my loads (servers...).
What are my solutions then?
I thought to introduce a fused panelboard instead of breaker. It would probably solve my problem. Expensive though cause the panel have to be hand-made.
I also thought to limit the short circuit current but how and what? By introducing an additional a serial impedance between my MCC (600V) and my panelboard, it would probably reduce the short circuit current. Extra cable? An inductance?
What do you think about that?