deerun75
Chemical
- Aug 26, 2011
- 7
I have a starting air process with a series of vessels in series. Each vessel is equipped with a PSV. The first PSV is set at 100 psi. At what pressure can I set the other PSVs? Setting them at 100 psi seems redundant since the first PSV will trigger at that pressure. Should I lower/increase the setting on subsequent PSVs? Any assistance is appreciated (especially those with references).