Sawsan311
Chemical
- Jun 21, 2019
- 303
Dear All,
I would like to enquire about when do we have to consider the scenario of pump kickback , I have seen it mentioned in one of the good engineering practices but I believe this would be applicable when the minimum flow recycle is equipped with Automatic recycle check valve rather than a sluggish conventional minimum flow control loop.
Appreciate your feedback.
thanks
I would like to enquire about when do we have to consider the scenario of pump kickback , I have seen it mentioned in one of the good engineering practices but I believe this would be applicable when the minimum flow recycle is equipped with Automatic recycle check valve rather than a sluggish conventional minimum flow control loop.
Appreciate your feedback.
thanks