maintennance
Mechanical
- Jan 26, 2008
- 46
For the Top suction- Top Discharge bb2 pumps , the discharge piping arrangement proposed is as enclosed. We have two pumps installed. The discharge piping ( green coloured) is purposely brought down and then taken back to the system only to facilitate discharge valves operation from the grade level. There is an apprehension that this sort of arrangement will hamper the pump performance / efficiency . We have high point vents in the pump as well as the piping. Please confirm whether the apprehension is valid.These pumps are for a refinery plant pumping hydrocarbons.