hokie66
Structural
- Jul 19, 2006
- 23,098
An existing slab has inadequate punching shear capacity at several columns. A proposed approach is to provide steel brackets/shear heads/corbels, epoxy bonded to the column and slab. Does anyone know of this being done? Any opinions appreciated.