Sy Engineer
Structural
- Apr 12, 2020
- 1
Hi, I'm currently working on my graduation project and I need to put the lower flang of a C section purlin on the upper flang of the portal frame's roof beam, but when I draw the purlins they were automatically connected to the center of the beam's web.
is there a way to move the purlin's lower flang so that it be placed on top of the upper flange of the roof's beam?
I've attached two pictures one on how the purlins are connected in my project and the other on how I want them to be connected
thank you for the help
is there a way to move the purlin's lower flang so that it be placed on top of the upper flange of the roof's beam?
I've attached two pictures one on how the purlins are connected in my project and the other on how I want them to be connected
thank you for the help