teckert
Structural
- Jul 30, 2009
- 30
Can anyone tell me where i can obtain a copy of the FEMA 356 Procedures for Pushover Analysis to determine the maximum displacments? This way i can avoid a non linear time history analysis.
Thanks,
Tim
Thanks,
Tim