I have a Waste Heat Boiler with water/steam 250°C shell side and gas 3490C tube side.
Tubes are A.106 Gr.B, tubesheet is P355NH EN10028.3 (like A.516.70)
Tubesheet are integral 26mm thick with bend radius.
tubes are 4" and are welded to tubesheet with a groove tipe 'J', full penetration.
The distance between center of tube holes is 156mm.
My question is:
When is mandatory the PWHT on welds on tube to tubesheets joints?
thanks - Bytejuice2