sksmechanical
Mechanical
- Feb 18, 2010
- 36
After inspecting a vessel (tower) it was decided that the vendor was required to remove a downcomer bar and re-install in another location. The tower was already post-weld heat treated. shall the vendor be required to do another post weld heat treat after this alteration? Their A.I. has already signed off on the order which states that no PWHT is required.