A contractor is hired for the creation of a chemical plant by owner though engineering, procurement and construction project (EPC) mode of project delivery. Is the design basis the first document issued?
Does each discipline issue a design basis? Is there a overall design basis?
Does each discipline issue a design basis? Is there a overall design basis?