During a telephone job interview I got a build up description of an Air Handling Unit (AHU) and was asked fi this was correct.
The consditioins are as follows: it is a fresh air uint for the arctic area with air in of -35 degrees C and out going of 5 degrees C.
The build up was described as follows:
damper open/close, anti frees unit, heater, drop eliminator, filters (pre and final), humidifier, drop eliminator, fan, damper open/close.
My opinion was that that the filter should go befor the heater and a drop eliminator after the heater was not required.
How ever the interviewer said this was the correct design, but did not tell me why ( to short time ).
What is your opinion of this fresh air unit?
The consditioins are as follows: it is a fresh air uint for the arctic area with air in of -35 degrees C and out going of 5 degrees C.
The build up was described as follows:
damper open/close, anti frees unit, heater, drop eliminator, filters (pre and final), humidifier, drop eliminator, fan, damper open/close.
My opinion was that that the filter should go befor the heater and a drop eliminator after the heater was not required.
How ever the interviewer said this was the correct design, but did not tell me why ( to short time ).
What is your opinion of this fresh air unit?