manija
Civil/Environmental
- Feb 23, 2000
- 8
my question is this:
i have two liquid metering stations both are very similar in configuration, except that one has the outlet and the inlet to/from the Prover at the very end of the station, with a block valve in between outlet and inlet branches who also has block valves. The other configuration has the outlet and inlet pipe to/form Prover after the valve for maintenance of the meter but before the pressure control valve.
i would like to know if both are correct and will work properly or if there are any code rule concerning theposition of pipe connection to Prover, Thanks in advance for any comment or sugestion
i have two liquid metering stations both are very similar in configuration, except that one has the outlet and the inlet to/from the Prover at the very end of the station, with a block valve in between outlet and inlet branches who also has block valves. The other configuration has the outlet and inlet pipe to/form Prover after the valve for maintenance of the meter but before the pressure control valve.
i would like to know if both are correct and will work properly or if there are any code rule concerning theposition of pipe connection to Prover, Thanks in advance for any comment or sugestion