Drew08
Civil/Environmental
- Oct 30, 2008
- 142
Hi all,
I'm trying to get a feel for what methods engineers typically used to determine the stage-discharge rating curve of a grass-lined, open-channel spillway. Something you might see functioning as an emergency spillway at an earthfill dam or retention pond.
Please share what you normally use, not necessarily what can be used.
Thanks.
I'm trying to get a feel for what methods engineers typically used to determine the stage-discharge rating curve of a grass-lined, open-channel spillway. Something you might see functioning as an emergency spillway at an earthfill dam or retention pond.
Please share what you normally use, not necessarily what can be used.
Thanks.