05dtaylor
Civil/Environmental
- Feb 10, 2011
- 18
I'm work for a precast concrete manufacturer. I'm drawing up some production plans for full-depth post-tension deck panels. The post-tensioning runs through 3" Dia PVC Ducts(3.5" O.D.) that will be cast-in of course. At the End Panels the engineer has specified that there be these #4 rebar hoops that encircle the ducts (as jacking reinforcement I'm assuming). I through together a drawing real quick to show my issue (Conceptual view doesn't show the 4-#5 Bars that run along the PVC inside of the ring but elevation view does). You'll see the interference issues that will happen. Any ideas/solutions that I should go to the engineer with? Hopefully I am clear enough.
Thanks for any help
Thanks for any help