Recommedations first filling

Status
Not open for further replies.

garciaf

Mechanical
Jun 12, 2016
64
Well, I would like to know recommedations for a fisrt filling of a pipeline that come from tanker passing trought PLEM and arrive to onshore to the last line "atmospheric tank), the pipeline is with water. all the recommedations, documents or standards that can be usefull in order to have all the necesary tool when the tanker arrive and be prepared during the first filling.
please help me.
Thank you for your time.
 
Replies continue below

Recommended for you

Well give us a bit of a clue.

Is this to load a tanker or offload?
What is the product?
Why has it not been thought of during the design?

Generally if you have a PLEM, you push all the water towards it so you can dispose of it at sea,

If you're going to have first fill of some sort of flammable product, you often push this with Nitrogen to create an inert environment.

Then you either wait for the first ship or arrange a special vessel to fill the pipeline with product from the PLEM or you can reverse flow ( if this is an import terminal) with product from the shore.

Note that most tanks need to get to a minimum level before you can flow into them at full flow to prevent flashing, splashing and excess vapour.

As far as I know there are no real standards for this, only company practices, requirements or procedures.

some more information would help a lot.


Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
 