junpal
Civil/Environmental
- Oct 28, 2004
- 5
I need help in the rectification of drainline the RCP pipes and inlet/outlet structure is above the design elevation of about 750mm, based on the actual condition pipes adjacent to the inlet is only 120mm above the bottom surface of the subbase material, our CQC recommend that to remove the pipes and structure inlet/outlet and re-install to correct design elevations but that I think is costly. any recommendation like cast reinforced concrete around the pipes for protection, but our CQC is not satisfied to this because when compaction of subbase start the concrete might be broken...
Thank You