Hi,

Could anyone please explain to me on what ground does Catia pick the order of part refresh in assembly and how to change it? My problem is explained in next example::

assembly.1
- part.1
- boolean parameter "part.2 activity"​
- part.2
- etc.

Action: Refresh on "assembly.1" level. Propagation: "all the levels". Now the thing is that in some cases "part.2" is ordered to refresh before "part.1" but the geometry of the "part.2" does not allow it. The boolean parameter in "part.1" should be set on false and that would prevent "part.2" refresh but that is not the case because "part.1" isn't refreshed yet.

Thanks for eventual replies.
Roman
 