puzzler77
Civil/Environmental
- Sep 8, 2009
- 23
The City of Wichita Falls is considering changing out its individual developement required detention with Regional Detention. Does anyone out there have any experience with Regional Detention? Several scenario's come to mind of how to go about putting the facilities in be it in a series along a streambed (in-line detention is discouraged), parallel detention (adjacent watersheds are detained prior to entering the main stream) or alternating detention where every other adjacent watershed such as watersheds on one side of the stream detain enough flow to make up for the unchecked watersheds. Pre and post developed conditions can be tricky as some development occured prior to the requirement. Regional detention could take into account all development and consider, for the pre-developed condition, the city didn't exist. Any thoughts on this matter would be greatly appreciated.