If one is retrofitting (new ahu,new controls,new insulation) a large VAV system which have humidity problems, would you try to solve it by installing a new terminal reheats or would you rely on the new AHU and controls upgrade without the reheat terminals.
I beleive that if the AHU is selected correctly and the controls are designed correctly, the humidity problems should be eliminated unless the problem resides outside the HVAC System. All the insulation chwr&chws and duct work is been replaced also. The application is for 50%RH.
Thanks for your comments.
I beleive that if the AHU is selected correctly and the controls are designed correctly, the humidity problems should be eliminated unless the problem resides outside the HVAC System. All the insulation chwr&chws and duct work is been replaced also. The application is for 50%RH.